Heavy Engineering · Since 1842 Case Construction Logo
Site Type Selector

Tell Case Construction Your Job-site — We Line Up the Iron

Five minutes of site questions, three machine recommendations, one service plan covering excavator digging depth, bucket capacity and Tier 4 Final documentation.

Six Worksite Packages Matched to Case Construction Fleets

Each card pairs contractor pain points with a recommended excavator, loader or compaction mix — use it as a starting brief for your dealer quote.

Subdivision Earthworks (5–15 acre)

Soft soils, frequent gradeability changes, utility trench conflict.

Recommended mix: mid-class excavator (20–30 t) + Case 580 backhoe loader + tandem roller + skid-steer for finish grade.

Highway Repaving (5–30 km)

Mat density windows, MTV feed reliability, night-shift compaction force targets.

Recommended mix: asphalt paver + MTV + two tandem rollers + Case excavator for shoulder cut and trench repair.

Quarry Expansion (Greenfield)

Face hardness swings, haul-road ground pressure, crusher feed size control.

Recommended mix: jaw + cone + screen plant + face-loading excavators + wheel loaders sized to truck cycle time.

Bridge Precast & Abutment Prep

Deep digging near water tables, boom geometry clearance, lift-plan coordination.

Recommended mix: 30–50 t crawler excavators for abutment cuts + support crane package for segmental sets.

Urban Demolition (≤ 12-story)

Dust suppression, slewing speed limits, high-reach boom inspection intervals.

Recommended mix: high-reach excavator + shear + dust-suppression bowser + Case mini excavator for selective interior strip-out.

Underground Tunnel Support (1–3 km drift)

Ventilation limits, emissions documentation, tight turning radius.

Recommended mix: compact excavators + jumbo drill support kits + ventilation-compliant Tier 4 Final packages.

Selection Trade-offs

Crawler Excavator vs. Wheeled Excavator — Site Fit, Not Sales Preference

Equipment managers weigh terrain, transport cost and cycle efficiency before locking a Case Construction excavator class. Both platforms ship with Tier 4 Final documentation; the right choice follows the haul road, not a brochure claim.

Crawler Excavator

Lower ground pressure (often 40–55 kPa on wider track shoes) suits soft quarry floors and riverbank abutment cuts. Stability supports deeper digging depth and higher breakout force on face-loading cycles. Trade-off: float moves usually need a lowboy, adding mobilization cost between distant packages.

Wheeled Excavator

Road travel without a trailer cuts transfer cost on urban trench and utility packages with frequent site hops. Faster repositioning helps municipal crews. Trade-off: higher ground pressure and reduced traction on saturated soils; not the default for deep quarry face loading.

Jaw Crusher vs. Impact Crusher — Primary Crushing Debate

When Case Construction packages include crushing & screening iron alongside excavators, primary crusher choice shapes feed size, product shape and maintenance windows.

Jaw Crusher

Simple structure, lower liner wear cost and wide feed-size tolerance (Mohs ≤ 9) make jaws the common primary on greenfield quarry expansions. Best when hardness swings and uptime matter more than cubic product shape.

Impact Crusher

Higher cubicity suits asphalt and concrete aggregate specs that reject elongated particles. Trade-off: faster wear on abrasive feed and tighter feed-size control from the excavator / loader circuit upstream.

Operating Boundaries Procurement Should Budget For

  • Soil & gradeability: Mid-class crawlers assume firm haul roads; soft clay or grades above OEM gradeability charts need wider track shoes or mats — otherwise ground pressure spikes and undercarriage hours shorten.
  • Emissions & ventilation: Tier 4 Final / EU Stage V packages still need aftertreatment regeneration windows; underground or enclosed demolition may require additional ventilation plans beyond the engine certificate.
  • Duty-cycle rebuild gates: Undercarriage and final-drive rebuilds are typically planned near 8,000 operating hours; abrasive quarry silica or continuous hard-rock face loading can pull that window earlier.
  • High-reach slewing limits: Demolition high-reach configurations enforce reduced slewing speed and boom inspection intervals between multi-story cycles — bid packages must include inspection downtime.

Five Questions That Pick Your Case Fleet

Toggle the constraints that apply — the preview below updates for equipment managers preparing bid packages.

Select site constraints to preview a Case Construction fleet mix.
Site supervisor reviewing excavator fleet plan on tablet

Get a tailored Case Construction equipment package quote in two business days

Include site type, daily cubic meters, paving kilometres and whether crawler versus wheeled excavator trade-offs matter for your haul roads. We return a package with bucket capacity, digging depth and undercarriage options.

Required
Required
Valid email required
Required
Required
Describe the machine class and worksite duty cycle